What a Low Painting Bid Leaves Out: The Prep Before the Paint
Published November 17, 2026 · Updated November 17, 2026
The steps a low exterior painting bid leaves out are almost always prep: the pressure wash, covering what isn’t being painted, crack and wood repair, a stucco conditioner, new caulk, and the back-roll behind the sprayer. None of them shows in the photos the day the job is finished. Together they decide whether the new paint grips the wall or the dust on it, and whether the cracks and caulk lines come back through it in a season.
I’m Robert, the owner of Maricopa Valley Painting. Almost every job we do is a repaint over paint that has faded and chalked in the sun, so prep is most of day one. Here’s each step, why it’s there on an Arizona house, and how to tell on day one whether it’s happening on yours.
The prep, step by step
| Step | What it does | When it’s skipped | How to check |
|---|---|---|---|
| Pressure wash everything to be painted | Takes off chalk, dust and loose paint so the new coat bonds to the wall | Paint goes on over chalk and lets go; the most common reason I see for a repaint failing early | Wet walls before any color; “pressure wash everything to be painted” on the quote |
| Cover windows, light fixtures, cameras and patio floors | Keeps the paint where it belongs | Paint on glass, fixtures and the patio | Plastic and paper up before the sprayer comes out |
| Repair cracks, stucco and wood | Elastomeric patch on hairline cracks and damaged wood; re-stucco and retexture where the finish has let go | Cracks come back through the new paint in a season | Patches visible before any color; repairs itemized on the quote |
| Loxon conditioner on the stucco | Binds what’s left of the old surface and gives the paint something to grip | New paint over a chalky wall can peel in a few summers | Named on the quote; goes on after the repairs, before the paint |
| Re-caulk windows and doors | Failed caulk cut out, new caulk in | Old caulk under new paint splits along the same line | Fresh caulk at the window and door frames before painting starts |
| Back-roll the stucco; brush the fascia | Pushes the paint into the stucco texture instead of leaving it on top | The paint sits on the surface of the texture | A roller following the sprayer on the walls |
1. The wash
Old paint in Arizona sun breaks down into chalk, the white powder that comes off on your hand. Paint over chalk is paint over dust. It looks fine for a while, then it lets go. That’s why the first thing on day one of every exterior we do is a pressure wash of everything that’s going to be painted, and why skipping it is the single biggest mistake I see on other painters’ work.
On a quote, look for the words “pressure wash everything to be painted.” On the day, you’ll see wet walls before you see any color.
2. Covering what isn’t being painted
Before the sprayer comes out, the windows, light fixtures, cameras and patio floors get covered. None of it shows when the job is done. It’s time on day one, and time is what a lower bid may not include. On our jobs it happens on day one, and you can walk the house and see it.
3. Repairs: cracks, stucco and wood
Hairline cracks get an elastomeric patch that stays flexible, so when the wall moves in our heat the patch moves with it instead of splitting. Where the stucco is hollow, lifting or crumbling, a patch won’t hold: that section is cut back to sound material, re-stuccoed and retextured to match. Sun- and water-damaged wood on the fascia and pop-outs gets its imperfections filled with the same elastomeric patch. Skip the repairs, or paint straight over them, and the cracks come back through the new paint in a season.
Repairs vary from house to house more than anything else on a quote, so they belong on it line by line. Our guide to hairline vs. real stucco cracks shows which kind you have, and our Phoenix stucco repair page covers when a crack needs a stucco or foundation contractor before a painter.
4. The conditioner
After the repairs, the stucco gets Loxon conditioner, especially where the old paint is faded or chalky. It binds what’s left of the old surface and gives the new paint something to grip. It’s also a step nobody can see once the paint is on, which makes it an easy one for a low bid to leave out. If a quote doesn’t name a conditioner, ask what’s going on the stucco before the paint.
5. The caulk
Look at the joint where the stucco meets each window and door frame. By the time the paint is chalking, the caulk has usually shrunk, cracked or pulled away. New paint over old caulk splits right along that line. We cut out what’s failed and re-caulk the windows and doors on every job; it’s a standard step, not an upgrade.
6. Spray, then back-roll
On stucco, a sprayer on its own leaves the paint sitting on top of the texture. We spray and back-roll: a roller follows the sprayer and pushes the paint into the stucco. Fascia is brushed by hand, doors go on in semi-gloss, and non-stucco block walls are sprayed. Two coats is our standard, and every coat it takes to cover a color change is in the quote.
Why a low bid leaves these out
Every step above is time and material, and most of it happens before any color goes on. A bid that leaves some of it out will come in lower, and it will be for a different job. That doesn’t make every lower bid a bad one: if the scope is the same, a lower number is a lower number. Compare the prep line by line before you compare the totals. Our guide to why two painting quotes on the same house differ walks through the rest of the quote.
What to ask before you sign
- Will everything being painted be pressure-washed first?
- What gets covered before you spray?
- How will the cracks and damaged wood be repaired, and is any re-stucco itemized?
- What goes on the stucco before the paint?
- Will the windows and doors be re-caulked, and is the old caulk cut out?
- Is the stucco back-rolled, or only sprayed?
Before any of that, check reviews, license, insurance and references, in that order. You can look up a contractor’s license on the Arizona Registrar of Contractors website; we’re licensed, bonded and insured under AZ ROC 328107.
How it runs on our jobs
A full exterior takes about three days:
- Day 1: pressure wash everything we’re painting; cover windows, light fixtures, cameras and patio floors; stucco, wood and drywall repairs; Loxon conditioner on the stucco.
- Day 2: finish repairs, re-caulk windows and doors, start painting, the body sprayed and back-rolled into the texture.
- Day 3: second coat, fascia and detail by hand, doors and garage door, touch-ups, clean-up and a walk-through with you.
Every step is written into the quote before you sign, and the work carries our 5-year written workmanship warranty covering peeling, cracking and fading. Someone from our team walks the house with you; most estimates take about 20 minutes, and the itemized written quote arrives within 24 hours. Book a free estimate.